Summary of the Reccomended Order Ruling

Here is a great layman's summary of the 277 page ruling:
  1. Palm Beach has failed to undertake a monitoring program to assure that the project does not have an adverse impact on the Florida Reef Tract.
  2. Palm Beach has failed to provide adequate engineering data concerning shoreline stability and performance, post-construction, and the potential impacts of the project upon the beach-dune system of Reach 8.
  3. Palm Beach has failed to provide sufficient mitigation to assure the performance of the Permit with respect to the covering of hardbottom.
  4. Palm Beach has failed to provide reasonable assurance that the direct and indirect coverage of hardbottom will be limited to 6.9 acres, so it has failed to provide adequate mitigation.
  5. Palm Beach has failed to provide any mitigation whatsoever for the expected deaths of five juvenile green turtles from the loss of 6.9 acres of hardbottom and additional juvenile sea turtles from the loss of additional hardbottom.
  6. Palm Beach has failed to provide any mitigation for the turbidity that would result from the project and deprive a wide range of species from the use of these beach and nearshore habitats, other than the mitigated hardbottom, for a period of about one year.
  7. Palm Beach has failed to justify the scope of this project, given the large overfill factor that results from the relatively large discrepancy between the mean grain size of the sand source and the existing beach.
  8. Palm Beach has failed to establish that Reach 8 is eroding, especially the majority of it that is not designated CEB.
    Palm Beach has failed to justify the use of a limited resource--offshore sand--to restore considerable lengths of nonCEB, especially where they may be other, dissipative beaches that are CEBs…
  9. Palm Beach has failed to show that the proposed project would produce a net positive benefit to the coastal system. To the contrary, the project would produce a net negative impact to the coastal system, again due to the use of excessive fines in the fill.
  10. The impacts from turbidity are unmitigated; the impacts from hardbottom coverage are only partly mitigated.
  11. Palm Beach has failed to protect all of the environmental functions of Florida's beaches by proposing to fill Reach 8 with fill whose mean grain size is little more than half the mean grain size of the existing beach and will not maintain the general character and functionality of the beach, dune, and coastal system of Reach 8.
  12. Palm Beach has failed to provide reasonable assurance that the project protects the water resources of the district from harm.
  13. Palm Beach has failed to provide reasonable assurance that the project is not contrary to the public interest.
  14. Palm Beach failed to show that the project would satisfy any one of the public-interest criteria except the criterion concerning archaeological and historical resources; even for the criterion of temporary versus permanent, the recurring nature of beach nourishments, on a cycle of probably two or three years, lends to the project a certain permanency.
  15. The project would affect the property of others in essentially closing the Lake Worth Municipal Beach and Lake Worth Pier for about one year.
  16. The project would interfere with public safety by elevating the turbidity of the local waters, so as to raise the risk of shark...
In less than 45 days Secretary Sole will come back with DEP's Final Order. Please feel free to contact DEP michael.sole@dep.fl.state.us or the Governor's office Charlie.Crist@myflorida.com to encourage them to adopt the Judge's ruling.